Testing & Commissioning

  • Individual System Functional Site Test

    Individual System Functional Site Test

    Functional site test to 2N, N+1 one leg at a time, fault disturbance and monitoring for a period trending, switchboard site point-to-point, main, sub, busbars measurement, SI, protection relay, ACB direct acting, earth loop impendence, PDU testing and verification, load testing, noise test, UPS, earthing grids, signal reference grid, visual inspections, etc.

  • Fully Integrated Level-5 Test & Commissioning

    Fully Integrated Level-5 Test & Commissioning

    Fully integrated functional tests will be used to prove the functionality of the data center against its design parameters. The service will stress test the data center environment and full functional tests scripts will be used to ensure that the redundancy and capacity is meeting the design specs and business needs.

  • Individual System Site Acceptance Test

    Individual System Site Acceptance Test

    Mains supply resilience, PQM, UPS on DC heater load, ATS operations, generators synchronization test, alarms activation, smoke detection simulation, gas activation in stages, room integrity testing, and other such integral testing components must all pass successfully to complete a full site acceptance test.

  • Testing & Commissioning Report

    Testing & Commissioning Report

    Providing full detailed test scripts, commissioning guides, reports of all conducted testing and commissioning, O&M checks, performance benchmarking, competency report, error reports, critical malfunction reports, design vs buildup misalignment reports and such related report documentation are necessary to effectively record and conclude all testing activities.